Microcement Restaurant Job…

We’ve been hard at it this week working in a restaurant on a floor and wall and we’re delighted with the end result!
𝑭𝒍𝒐𝒐𝒓 𝒑𝒓𝒐𝒄𝒆𝒔𝒔
You’ll see in the first photo that the floor was in a really poor condition when we lifted the lyno.
We had to level the floor and leave fans running 24/7 along with dehumidifiers to dry the whole thing out. The floor was primed, levelled and then we added liquid membrane which is a liquid rubber system.
mesh and base coat, black microcement medio top coat finished in a high strength solvent sealer.
𝑭𝒊𝒏𝒊𝒔𝒉𝒆𝒅 𝒇𝒍𝒐𝒐𝒓
Once the base coat went down and dried we were able to add this black microcement medio top coat finished in a high strength solvent sealer. This restaurant will have a lot of traffic and naturally there will be spillages, or people dropping heavy equipment by accident – microcement will withstand the test of time.
𝑴𝒊𝒄𝒓𝒐𝒄𝒆𝒎𝒆𝒏𝒕 𝒘𝒂𝒍𝒍
Whilst all this was happening with the floor we also finished the walls you see in the final photo in a dark grey microcement fino with gloss solvent sealer.
Everything about this job is stunning and the restaurant looks amazing 😍